Projects

  • Dredging Services
    • Shallow Draft Intracoastal and Barge Canal Dredging
    • Deep Draft Ship Dock Dredging
    • Environmental Dredging and Dewatering
    • Customized Annual and Maintenance Dredging Programs
  • Levee Construction and Management
    • Dredge Area Management Program (DAMP)
  • Environmental Construction
    • Wetlands
    • Shoreline Protection
    • Beach Renourishment
    • Geotube Construction
    • Reef Creation Projects
  • Marine Facility Construction
    • Bulkheads
    • Docks and Piers
    • Marinas
    • Bridges

USACE Galveston District – Gulf Intracoastal Waterway, Texas in Willacy County, Texas Channel to Harlingen

Date: March 2011 – June 2011

Description: Pipeline dredging; 450,000 cubic yards; pipeline lengths of 10,000 feet


BORCO Pipeline Stabilization Project - Freeport, Bahamas

Date: October 2011 - February 2012

Description: Placement of underlayer and armor stone to protect a corridor of 9 pipelines which runs to an offshore ship loading facility in depth of 0 to 20 feet of water.


Port of Harlingen – Maintenance Dredging

Date(s): January 2011 – March 2011
Description: Pipeline dredging; 60,000 cubic yards; pipeline lengths from 5,000 feet to 10,000 feet






Port of Galveston – 5-Year Maintenance Dredging

Date(s): 2010 to Present
Description: Pipeline dredging; volumes vary per cycle; pipeline lengths from 5,000 to 15,000 feet


Port of Galveston – Dredging Turning Basins

Date(s): October 2011 – November 2011
Description: Pipeline dredging; 100,000 cubic yards pipe lengths from 5,000 to 8,000 feet


Port of Houston – Maintenance Dredging Bayport Wharf 3

Date(s): September 2010 – October 2010
Description: Pipeline dredging; 50,000 cubic yards; pipeline length of 7,000 feet


LBC Terminals – Dredging & Placement Area Construction

Date(s): February 2010 – April 2010
Description: Pipeline dredging & placement area construction; 40,000 cubic yards dredged and construction of 10-acre levee/placement area system


Texas International Terminals – Dredging & Placement Area Construction

Date(s): March 2010 – September 2010
Description: Pipeline dredging & placement area construction; 250,000 cubic yards of dredging;
20-acres of levees and placement areas constructed for excess spoil disposal






Gulf Sulphur Services – Annual Maintenance Dredging

Date(s): October 2009 - Present
Description: Pipeline dredging; annual maintenance contract for facility basin and slip
maintenance; volumes vary by cycle







Galveston/Texas City Pilots Association – Maintenance Dredging

Date(s): September 2010 – October 2010
Description: Pipeline dredging; 20,000 cubic yards of dock slips for vessel clearance


USACE Galveston District – Bolivar Marsh/Evia Island Debris Removal

Date(s): April 2010 – May 2010
Description: Debris removal from marsh areas, dredge disposal areas and levees in Galveston County coastal locations.


Texas General Land Office – Texas Beach Debris Removal & Restoration

Date(s): November 2008 – February 2009
Description: Debris removal, sand screening and sand replacement (over 2.5 million cubic yards of material) on over 60 miles of Texas beaches following Hurricane Ike – Galveston & Brazoria Counties.