Projects
Dredging Services
- Shallow Draft Intracoastal and Barge Canal Dredging
- Deep Draft Ship Dock Dredging
- Environmental Dredging and Dewatering
- Customized Annual and Maintenance Dredging Programs
- Levee Construction and Management
- Dredge Area Management Program (DAMP)
- Environmental Construction
- Wetlands
- Shoreline Protection
- Beach Renourishment
- Geotube Construction
- Reef Creation Projects
- Marine Facility Construction
- Bulkheads
- Docks and Piers
- Marinas
- Bridges
USACE Galveston District – Gulf Intracoastal Waterway, Texas in Willacy County, Texas Channel to Harlingen
Date: March 2011 – June 2011
Description: Pipeline dredging; 450,000 cubic yards; pipeline lengths of 10,000 feet
BORCO Pipeline Stabilization Project -
Freeport, Bahamas
Date: October 2011 - February 2012
Description: Placement of underlayer and armor stone to protect a corridor of 9 pipelines which runs to an offshore ship loading facility in depth of 0 to 20 feet of water.
Port of Harlingen – Maintenance Dredging
Date(s): January 2011 – March 2011
Description: Pipeline dredging; 60,000 cubic yards; pipeline lengths from 5,000 feet to 10,000 feet
Port of Galveston – 5-Year Maintenance Dredging
Date(s): 2010 to Present
Description: Pipeline dredging; volumes vary per cycle; pipeline lengths from 5,000 to 15,000 feet
Port of Galveston – Dredging Turning Basins
Date(s): October 2011 – November 2011
Description: Pipeline dredging; 100,000 cubic yards pipe lengths from 5,000 to 8,000 feet
Port of Houston – Maintenance Dredging Bayport Wharf 3
Date(s): September 2010 – October 2010
Description: Pipeline dredging; 50,000 cubic yards; pipeline length of 7,000 feet
LBC Terminals – Dredging & Placement Area Construction
Date(s): February 2010 – April 2010
Description: Pipeline dredging & placement area construction; 40,000 cubic yards dredged and construction of 10-acre levee/placement area system
Texas International Terminals – Dredging & Placement Area Construction
Date(s): March 2010 – September 2010
Description: Pipeline dredging & placement area construction; 250,000 cubic yards of dredging;
20-acres of levees and placement areas constructed for excess spoil disposal
Gulf Sulphur Services – Annual Maintenance Dredging
Date(s): October 2009 - Present
Description: Pipeline dredging; annual maintenance contract for facility basin and slip
maintenance; volumes vary by cycle
Galveston/Texas City Pilots Association – Maintenance Dredging
Date(s): September 2010 – October 2010
Description: Pipeline dredging; 20,000 cubic yards of dock slips for vessel clearance
USACE Galveston District – Bolivar Marsh/Evia Island Debris Removal
Date(s): April 2010 – May 2010
Description: Debris removal from marsh areas, dredge disposal areas and levees in Galveston County coastal locations.
Texas General Land Office – Texas Beach Debris Removal & Restoration
Date(s): November 2008 – February 2009
Description: Debris removal, sand screening and sand replacement (over 2.5 million cubic yards of material) on over 60 miles of Texas beaches following Hurricane Ike – Galveston & Brazoria Counties.